BUILDING YOUR MADE-TO-MEASURE STAINLESS-STEEL FERMENTER

FROM PURCHASE ORDER TO ON-SITE START-UP IN 20 MONTHS

This page walks you through the full journey—design, fabrication, and installation—in five short videos. Every fermenter is built to your specific URS, so once we receive your order we switch to project mode and execute the workflow shown here. The videos are based on real projects and mirror what you can expect on your line.

#1 DETAILED DESIGN

#2 MANUFACTORING PHASE

#3 FAT ( Factory Acceptance Tests )

#4 PACKING AND SHIPPING

#5 ON SITE COMMISSIONNING AND TRAINNIG (SAT)

TALK WITH A SPECIALIST AND GET YOUR QUOTE

NEXT STEPS:

  1. Tell us your organism, working volume, and strategy.
  2. We propose configuration, scope, and timeline.

WHY BLANC-LABO

Operational in 20 weeks. Moving forward safely even on a tight budget.

  • Fixed deadline: clear milestones and go-live in 20 weeks.
  • Turnkey: selection → design → manufacturing → IQ/OQ → start-up with your recipes.
  • Industrial control: Siemens S7 PLC + BIOWIT, alarms, data logging and OPC-UA.
  • Real scaling: same logic from lab to pilot and industrial (0.2 L → 50,000 L).
  • Local support: installation, training, maintenance and spare parts in the UK.
  • Defined cost and scope: closed proposal by configuration, no surprises.
  • For your process: bacteria, yeasts, cells, microalgae; batch, fed-batch or perfusion.
  • Complete documentation: URS, port lists, P&ID (NDA), FAT/SAT, exportable reports.

For teams that need to validate now. Reliable data, quick decisions.

OUR SERVICES

COMMISSIONING

Unpacking and installation with order conformity check. Connection to customer utilities according to manufacturer specifications. Commissioning and on-site training provided by Blanc Labo technicians.

AFTER-SALES SERVICE

Preventive and corrective maintenance with customised plans: original spare parts, on-site interventions and remote assistance. Options for contracts, SLAs and scheduled downtime calendars.

CONSUMABLES, SPARE-PARTS

Agile supply of consumables and wear parts: identification of references, quick quotation and scheduled delivery according to your usage plan.